Skip to content

Releases

Each release’s notes are in the skill’s repository, and every change, breaking ones first, is in the CHANGELOG. The open defects a release ships with are listed by id on the known-issues page.

Release Date Summary Notes
6.4.0 2026-11-16 A release carries the evidence a change board accepts, and a run’s cost is forecast before it starts and set beside what it cost; ships 369 open defects, 65 Medium and 304 Low Release 6.4.0 - notes
6.3.0 2026-11-08 A run’s cost is measured on whichever harness ran it and stated in US dollars, and a lane runs headless in any of five harnesses’ CLIs; ships 251 open defects, 60 Medium and 191 Low Release 6.3.0 - notes
6.2.0 2026-11-02 A review brief can require the author’s own check first, and a run states what it cost, priced over every subagent; ships 176 open defects, 56 Medium and 120 Low Release 6.2.0 - notes
6.1.0 2026-10-03 A run ends with the report you sign, and the report states what it measured; ships 2 open defects, 1 Medium and 1 Low Release 6.1.0 - notes
6.0.0 2026-09-29 One plan, one independent review per unit, one signature; ships 35 open Medium defects Release 6.0.0 - notes
6.0.0-rc.1 2026-09-26 The v6 release candidate, a pre-release: one verdict ledger decides whether a unit was reviewed, and one signature seals the run notes
5.1.0 2026-09-10 Every Medium open at 5.0.1 disposed of or ruled notes
5.0.1 2026-08-12 A patch for one High defect: the verified install path had never worked notes
5.0.0 2026-08-12 The process stops being advice and becomes a gate notes

Releases before 5.0.0 are in the CHANGELOG only. To move a 6.3 project to 6.4.0, see From 6.3 to 6.4; from 6.2, take From 6.2 to 6.3 as well, and from 6.1, From 6.1 to 6.2 too; from v5, Upgrading to v6.